the tile installer was in the past couple weeks to install flooring in the kichen and baths. they didn't order enough for the tub surround in the master bath, though. estimated time of arrival - September 9. the air conditioner has finally been reinstalled, and was working well last night - it wasn't too warm outside (low 80s), but was very humid. triming around the new rough openings is complete. bathroom cabinets have been installed and kitchen cabinets should go in next week